Asphalt paving, sealcoating and repair around Clarksville and NashvillePaving and sealcoating in Clarksville, TN
Greenfield Pavement Coatings
New asphalt driveway running through a grassy field toward the trees, driveway permit guide
Call (931) 362-7283 Request a Quote

Do You Need a Driveway Permit in Tennessee?

In most cases, yes, when a new or changed driveway meets a public road. The permit comes from whoever owns that road, and it comes before any work starts. On a state route, that is TDOT. On a city street, it is the city. On a county road outside city limits, it is the county.

Greenfield Pavement Coatings builds asphalt driveways for homes across Clarksville and the Nashville area. This guide shows which office to ask, who applies and what each office’s own page says. Rules and fees change, so confirm them with the office before you plan the work.

Who issues a driveway permit in Tennessee?

The office that owns the road your driveway meets. For this question, roads fall into three groups:

  • State routes: the Tennessee Department of Transportation (TDOT).
  • City streets: the city, usually through its street or engineering department.
  • County roads outside city limits: the county highway department.

Gallatin’s driveway page tells owners on a state route to contact the local TDOT office. Clarksville’s ordinance says a state highway falls under the state transportation department’s rules. Not sure who owns your road? Start with the city or county office.

State rule 1680-10-01-.02 says the state’s driveway rules apply in addition to any county or city rules. The same chapter says the rules are there to keep proper drainage and protect the roadway from damage.

When do you need a TDOT driveway permit?

TDOT says state law requires a permit before a driveway is built on state highway right-of-way. The same permit covers modifying, revising or changing the use of an existing driveway there. TDOT also says who applies: “Property owners must obtain a permit from TDOT.”

Which TDOT office handles it depends on the job:

  • Homes and fields: residential and field driveway permits go through your local TDOT district office. For Montgomery, Robertson, Dickson, Cheatham and Maury counties, that office is at 10241 Hwy 70 East, McEwen.
  • Businesses: a commercial entrance goes in online through TDOT Highway Driveway. The application needs an engineering checklist, a site plan and grading or drainage plans. It also takes a surety, such as a bond or a cashier’s check. TDOT still requires the original hard copy.

TDOT’s commercial page is firm on timing: no work starts until the commercial driveway permit is officially issued. Planning an entrance for a business lot? Settle the permit before the parking lot paving goes on the calendar.

TDOT also notes that reasonable access does not mean the most direct or most convenient access from a given road.

What do Clarksville and other cities require?

City streets belong to the city, and each city writes its own rules. Here is what the city pages say:

  • Clarksville: no curb or right-of-way may be cut, paved or otherwise altered until an access permit is approved. That rule is in the city’s driveway access ordinance. The permit comes from the Clarksville Street Department or the agency that controls the road. Each parcel needs its own access permit, and on a new build it comes before the building permit.
  • Springfield: the Street Department issues driveway permits and inspects lots inside the city limits. Any driveway construction or repair in the right-of-way or easement needs a permit before work begins. The page says the permit has no fee.
  • Gallatin: the driveway permit covers new driveways and changes to existing ones. The application fee is $150.
  • Spring Hill: the city FAQ says driveway extensions need a permit.
  • Nashville: the city’s transportation department (NDOT) lists a driveway permit for right-of-way work on a home or business driveway. It asks for an area sketch and lists a $160 fee, with the work done within 1 year. Building the driveway before the permit brings a triple fee. Applications go through ePermits.
  • Murfreesboro: the city’s right-of-way permit list includes widening or expanding a home driveway, at $50 per street affected.

What about a county road outside city limits?

Montgomery County shows how a county handles it. A driveway on a county road starts with a call to the County Highway Department. The county’s Traffic Control Foreman then inspects the site for suitable access and decides the culvert requirements.

The fee follows the culvert:

  • Culvert needed: a deposit on a bond, sized to the culvert.
  • No culvert needed: a $250 frontage fee.

You apply at the County Highway Department, 1302 Crossland Avenue, Clarksville. The driveway must be finished before the county reinspects it. A satisfactory reinspection returns the deposit. Other counties set their own steps, so call the highway department in the county where the land sits.

Setting a culvert is another trade’s work. Past the entrance, a long rural drive or farm lane may suit tar and chip instead of hot mix asphalt.

Do you need a permit to repave or sealcoat an existing driveway?

Not on the pages we read, for the part inside your property line. None of the pages above asks for a permit to repave, overlay or sealcoat that part of an existing driveway. Springfield is the one to check closely: its rule also covers repair in an easement. That is what the pages say, not a ruling, so ask the office before work starts. An overlay over a sound base is asphalt resurfacing, and the black protective coat is sealcoating.

The right-of-way strip between your property line and the road is different. Clarksville’s ordinance covers paving in the right-of-way. Springfield’s covers repair there too. Nashville’s permit covers maintenance of a driveway in the right-of-way. Widening or extending a driveway is a change, and TDOT, Gallatin and Spring Hill all name changes or extensions.

Who applies, and what comes first?

On a state route, the property owner applies, and TDOT puts that in plain words. Springfield’s page puts the permit on any person, contractor or firm doing driveway work in its right-of-way, so ask each office who may apply. Here is the order the pages point to:

  1. Find out who owns the road the driveway meets.
  2. Call that office and apply.
  3. Wait until the permit is issued.
  4. Before anyone digs, notice goes to Tennessee 811. The state utility commission says anyone planning to dig must give notice first. The window is at least three, and not more than ten, working days before the work.
  5. Then the driveway goes in, and inspections follow where the office calls for them.

Ready to plan your asphalt driveway?

With the permit question settled, the paving can be planned around it. Greenfield Pavement builds new asphalt driveways and full replacements across Middle Tennessee with our own pavers. We look at the job and put the quote in writing. Call or text (931) 362-7283.

Frequently asked questions

Do I need a permit to widen my driveway?
Often, yes: TDOT's permit covers changes to an existing driveway on state right-of-way. Gallatin's covers changes to existing driveways, and Murfreesboro's right-of-way list names widening a home driveway. Spring Hill's FAQ says driveway extensions need a permit. Ask the office that owns the road before work starts.
How much does a driveway permit cost in Tennessee?
It depends on the office. Gallatin's application fee is $150, and Springfield's page says its permit has no fee. Nashville's NDOT lists $160, and Montgomery County charges a $250 frontage fee when no culvert is needed. Fees change, so confirm the amount when you apply.
How long does a driveway permit take?
Each office sets its own pace. Clarksville's ordinance says review of an access plan takes no longer than 10 working days. Ask the office for its timing when you apply, and leave room for it before the paving date.
Can work start before the permit is issued?
Not on the work the permit covers. TDOT's commercial page says no work starts until the permit is officially issued. Clarksville's ordinance says no curb or right-of-way may be cut, paved or otherwise altered until an access permit is approved. In Nashville, building the driveway before the permit brings a triple fee.
Do I need a building permit for a driveway?
The driveway or access permit comes from the road's owner, and it is separate from a building permit. In Clarksville, the access permit must be issued before a building permit. Mount Juliet's building codes page exempts driveways not more than 30 inches above grade from a building permit. The street connection is still a question for the office that owns the road.
Who decides whether my driveway needs a culvert?
Usually the office that owns the road. On a Montgomery County road, the county's Traffic Control Foreman inspects the site and decides the culvert requirements. The bond deposit is then sized to the culvert. Setting a culvert is another trade's work.
Are these permit fees what Greenfield Pavement Coatings charges?
No. The fees here are set by the issuing city, county or state and paid by whoever applies. Our price for the asphalt work comes as a written quote after we look at the job. Call or text (931) 362-7283.
Request a Quote

Get In Touch With Greenfield Pavement

Tell us about the driveway or the lot and the town it is in. Call or text (931) 362-7283, or send the quote form, and we will get back to you.

Request a Quote

Tell us about the driveway, parking lot or repair and where it is. We look at the job and put the quote in writing.

Call (931) 362-7283