Published cost guides put a new asphalt driveway between $3 and $13 per square foot. National cost guides from 2025 and 2026 list $7 to $13 per square foot for a new build. A Nashville-area cost-estimator page lists $4 to $6, and a national contractor marketplace lists $3 to $5. The local Middle Tennessee figures sit under the national numbers.
For a two-car driveway of about 600 square feet, one national guide lists $2,500 to $7,000. The contractor marketplace lists a typical project at $2,300 to $7,000, with $4,000 the most common total. Those are market numbers from published guides, not a price list. Greenfield Pavement Coatings measures each new asphalt driveway and puts the quote in writing.
What do cost guides list per square foot?
The table lists the published ranges by job and kind of source.
| Job | Published range per square foot | Kind of source |
|---|---|---|
| New asphalt driveway | $7 to $13 | national cost guides, 2025 and 2026 |
| New asphalt driveway | $4 to $6 | Nashville-area cost-estimator page, 2022 |
| New asphalt driveway | $3 to $5 | national contractor marketplace, 2026 |
| Full replacement, tear-out plus new asphalt | $8 to $15 | national cost guides |
| Overlay over a sound base | $3 to $7 | national cost guides |
| Two-inch overlay | $2 to $3 | Nashville-area cost-estimator page, 2022 |
| Tear-out and haul-off only | $1 to $3 | demolition cost guides |
National guides blend big coastal metros with small towns. The local estimator page dates from 2022. The marketplace figure is one national average across every size of job. A statewide contractor-survey report lists about $2 to $4 per square foot. Its entries date from 2018 and 2019.
What does a typical driveway size cost?
Driveway size moves the total more than anything else. The totals below are published figures from a 2025 national cost guide and a 2022 Nashville-area estimator page.
| Driveway | Size | Published total | Kind of source |
|---|---|---|---|
| Single car | 12 by 20 feet, 240 square feet | $1,440 to $2,160 | national cost guide, 2025 |
| Single car, long | 12 by 40 feet, 480 square feet | $1,800 to $3,100 | Nashville-area estimator, 2022 |
| Two car | 20 by 28 feet, 560 square feet | $3,360 to $5,040 | national cost guide, 2025 |
| Two car | 24 by 32 feet, 768 square feet | $4,600 to $6,910 | national cost guide, 2025 |
| Two car, long | 24 by 40 feet, 960 square feet | $3,500 to $6,200 | Nashville-area estimator, 2022 |
Measure length times width and you have the number every quote starts from. A long rural drive of 12 by 150 feet is 1,800 square feet. That is almost twice the largest size in the table. Small jobs often price higher per square foot. The paver and the roller cost about as much to bring out for 240 square feet as for 960.
What drives the price of an asphalt driveway?
Base work comes first. A trade association’s driveway guide calls for 6 to 8 inches of crushed stone base under a new drive. The ground under it is graded smooth, and soft spots are cut out and replaced with sound material. Fill around a new house can keep settling. The same guide suggests waiting a few months before paving over it.
Thickness is the next line on the quote. The same guide describes an ordinary residential driveway as a 2-inch bottom course under a 1.5-inch surface course. That is 3.5 inches in all. A drive that carries a work truck, a camper or a trailer may need a thicker section. Hot mix asphalt sells by the ton, and national guides list $100 to $200 a ton. A 2-inch lift covers about 80 square feet per ton, so every added inch means more tons.
Tear-out is the big difference between a new build and a replacement. Demolition cost guides list $1 to $3 per square foot to break out old asphalt and haul it off. That is why national guides price a full replacement at $8 to $15 per square foot. A new build on bare ground skips that line.
Access matters too. A tight drive between a house and a fence means more hand work. A steep grade, a long haul from the asphalt plant or a culvert at the road all add cost. A lot that needs grading or a drainage fix before paving is a separate job for another trade. Tear-out and base work count as digging under Tennessee’s one-call law. Tennessee 811 gets the buried utility lines marked first, with at least three working days’ notice.
New driveway or overlay: which one are you pricing?
An overlay, also called asphalt resurfacing, lays new hot mix over the old surface instead of tearing it out. The trade guide describes it as 1.5 to 2 inches of surface mix over a driveway that is still sound. Weak spots and large cracks get cut out and patched first. An old weathered surface gets a tack coat so the new lift bonds to it.
National guides list an overlay at $3 to $7 per square foot. The Nashville-area estimator page lists $2 to $3 for a 2-inch overlay. Against $8 to $15 for a full replacement, the savings are real. They hold only while the base underneath still does its job. Where the old drive meets a garage slab or a sidewalk, ask how that edge is handled. Milling the edge keeps the new lift flush with the slab.
An overlay over a failed base is money wasted. Alligator cracking points at the base. So do soft spots that move under a truck and water that stands after rain. New asphalt laid on top tends to crack along the same lines. Our guide on repair, resurface or replace walks through the signs.
How do you read an asphalt driveway quote?
The trade association’s advice is to get more than one written quote and to compare them line by line. It also warns that the lowest quote may not be the best one. A quote you can compare spells out these items:
- The square footage, and the length and width it came from.
- The asphalt thickness, and whether that number is after compaction.
- The base: new crushed stone and its depth, or the existing base reused.
- Tear-out and haul-off, when the old driveway is coming out.
- A tack coat and edge milling on an overlay.
- The pitch that sheds water, and how the edges meet the garage and the street.
- Start and finish dates, and when you can park on it.
- Who contacts Tennessee 811, and whether the city wants a permit where the drive meets the street.
The trade guide says new asphalt can carry a car soon after placement. It still suggests waiting a few days. Keep a loaded moving truck off a fresh mat. The same guide says to hold off on sealcoating until the driveway is at least several months old. Sealer after that, every two to five years, is upkeep rather than part of the paving quote.
Ready for a number on your driveway?
Published ranges show what the market looks like. Your driveway’s number depends on its square footage and what is under it. If the old surface comes out, that adds the tear-out. Greenfield Pavement looks at the driveway, measures it and puts the quote in writing. Check it against the list above. For driveway paving in Clarksville and the Nashville area, call or text (931) 362-7283.